Overtime after 13 hours is an additional $540/hour for stage, manager, and power.
Stage A: Shoot / Pre-Light Day (12 Hours)
Includes: Stage Manager, Truck/Client Lot, Power, Wi-Fi, Production Supplies, and Dumpsters (1 Trash, 1 Recycling)
Does Not Include: Stage B, Corkage, Air Conditioning, Scissor Lifts, and Upstairs Support Rooms / Bathrooms
$3,420
Stage B: Shoot / Pre-Light Day (12 Hours)
Includes: Stage Manager, Truck/Client Lot, Power, Wi-Fi, Production Supplies, Dumpsters (1 Trash, 1 Recycling), and Downstairs Support Rooms
Does Not Include: Stage A, Corkage, Air Conditioning, Scissor Lifts, and Upstairs Support Rooms / Bathrooms
$2,100
Build / Wrap Day (12 Hours)
Includes: Stage Manager, Truck/Client Lot, Power, Wi-Fi, Production Supplies, and Dumpsters (1 Trash, 1 Recycling)
Does Not Include: Scissor Lifts and Air Conditioning
$2,280
Stage Overtime (Hourly After 13 Hours)
Includes: stage, manager, and power
$540/hour
Corkage (Additional Fee for Outside G&E)
Note: included in Package Deals (see above)
$600
Air Conditioning for Stage A (Not Silent)
$420
2x Scissor Lift
$270 each
Cleaning
$420
2nd Floor Green Room Suite with 2 Extra Bathrooms
$360 each
Gojaks (Set of 4)
$120
Overnight Truck / Gear Parking (Before or After Job)
$90
Additional Parking Lot 1 (50 Crew Spots)
$800
Additional Parking Lot 2 (150 Crew Spots)
$1,200
$1,800
DF50 Hazer
$90
Briese Lights
Inquire
Additional G&E Available
Inquire
Cyc Floor Restoration
Pristine White Floor and Walls includes Paint and Labor; otherwise cyc is delivered swept clean but “as is” paint from previous production
$720 for Stage A, $420 for Stage B
Entire Cyc & Floor Painting
Includes: Standard colors including Black and Chroma Green Match (not name brand) paint, labor and restore back to white
Does Not Include: name brand Chroma Green, Digi Green or Blue — call to inquire, additional costs apply
$4,200 for Stage A, $1,500 for Stage B